Environmental and Social Impact Assesment (ESIA)
...
EIA Reports
- NOTICE TO THE PUBLIC TO SUBMIT COMMENTS ON AN ENVIRONMENTAL IMPACT ASSESSMENT STUDY REPORT PROPOSED
MANGU-THIKA EAST 66KV DUAL CIRCUIT SUB-TRANSMISSION POWER LINE, IN THIKA WEST DISTRICT
- Nema Ad - Notice to the Public to submit comments on ESIA study report for the proposed Mangu_Thika 33kV Dual Line
- ENVIRONMENTAL & SOCIAL MANAGEMENT FRAMEWORK FOR KENYA POWER DISTRIBUTION AND TRANSMISSION PROJECTS REVISED SEPTEMBER - 2012
- KIPEVU-MAKANDE-MBARAKI ESIA REPORT
- EIA Project Report of Lavington 66/11 KV Sub Station
- EIA Project Report of Kiambu 66/11 KV Sub Station
NEMA
ESIA Reports
- Addendum - LTWP - Road Rehabilitation ESIA
- DRAFT ENVIRONMENTAL AND SOCIAL IMPACT ASSESSMENT (ESIA) REPORT FOR THE PROPOSED STRENGTHENING OF LAISAMIS- SOUTH HORR (D371) AND SOUTH HORR- LOIYANGALANI (C77) ROAD
- ESIA Report Lake Turkana Wind Power Project - Executive Summary
- ESIA Report Lake Turkana Wind Power Project - Updated Report
Updated 12/10/2012
--------------------------------------------------------
Environment and Social Impact Assessment Study for the Proposed MSD Power Plant, Athi River, Kenya
- 00A Cover_Page
- 01-Executive Summary
- 02-Introduction
- 03-Methodology_for_the_ESIA_Study
- 04-Project_Objectives
- 05-Project Description
- 06-Project_Alternatives
- 07-Environmental_Legislative_and_Regulatory_Framework
- 08-Construction_HSE_Management_Plan
- 09-Environmental and Socio-economic baseline
- 10-Technology__procedures_and_processes
- 11-Construction_Processes_and_Materials
- 12-Products__by-products_and_wastes
- 13-Environment_and_Social_Impact_Assessment
- 14-Environment_and_Social_Impact_Management_Plan
- 15-Incident_Prevention_and_Hazard_Communication_Plan
- 16-Health_Hazard_Prevention_and_Security
- 17-Gaps_in_Knowledge_and_Uncertainties_Encountered
- 18-Conclusions
- Appendix A-Air Quality Impact Assessment
- Appendix B-Noise_Level_Survey_Report
- Appendix C-Geology and Hydrogeology
- Appendix D-Soils_Report
- Appendix E-Ecology
- Appendix F-Socio-economic Assessment
- Appendix G-Archeological_Assessment
- Appendix H-Land_Use_Report
- Appendix I-Traffic Assessment Report
Other reports
- Olkaria_III_Audit_2010-January 2011
- ESIA of Two 250 KW Wind Turbines at Marsabit District
- ESMF KPLC Kenya Electricity Expansion Projoct
- ESIA Voi-Taveta 132 KV TL
- ESIA Eldoret - Kitale 132 KV TL
- ESIA Nanyuki - Meru, Ishiara - Kieni, Mwingi - Kitui - Wote
- ESIA Olkaria - Narok - Bomet - Sotik and Kisii-Sondu 132 KV
- Final Rev ESIA Report Kisii-Awendo 132kV Line October2010
- ESIA Lessos -Kabaranet -Nyahururu -Nanyuki 132 KV TL
- ESIA Mumias-Rangala-Kisumu 132KV TL
- ESIA Kindaruma-Mwingi-Garissa 132 KV TL
...
EIA Reports
- NOTICE TO THE PUBLIC TO SUBMIT COMMENTS ON AN ENVIRONMENTAL IMPACT ASSESSMENT STUDY REPORT PROPOSED
MANGU-THIKA EAST 66KV DUAL CIRCUIT SUB-TRANSMISSION POWER LINE, IN THIKA WEST DISTRICT - Nema Ad - Notice to the Public to submit comments on ESIA study report for the proposed Mangu_Thika 33kV Dual Line
- ENVIRONMENTAL & SOCIAL MANAGEMENT FRAMEWORK FOR KENYA POWER DISTRIBUTION AND TRANSMISSION PROJECTS REVISED SEPTEMBER - 2012
- KIPEVU-MAKANDE-MBARAKI ESIA REPORT
- EIA Project Report of Lavington 66/11 KV Sub Station
- EIA Project Report of Kiambu 66/11 KV Sub Station
NEMA
ESIA Reports
- Addendum - LTWP - Road Rehabilitation ESIA
- DRAFT ENVIRONMENTAL AND SOCIAL IMPACT ASSESSMENT (ESIA) REPORT FOR THE PROPOSED STRENGTHENING OF LAISAMIS- SOUTH HORR (D371) AND SOUTH HORR- LOIYANGALANI (C77) ROAD
- ESIA Report Lake Turkana Wind Power Project - Executive Summary
- ESIA Report Lake Turkana Wind Power Project - Updated Report
Updated 12/10/2012
--------------------------------------------------------
Environment and Social Impact Assessment Study for the Proposed MSD Power Plant, Athi River, Kenya
- 00A Cover_Page
- 01-Executive Summary
- 02-Introduction
- 03-Methodology_for_the_ESIA_Study
- 04-Project_Objectives
- 05-Project Description
- 06-Project_Alternatives
- 07-Environmental_Legislative_and_Regulatory_Framework
- 08-Construction_HSE_Management_Plan
- 09-Environmental and Socio-economic baseline
- 10-Technology__procedures_and_processes
- 11-Construction_Processes_and_Materials
- 12-Products__by-products_and_wastes
- 13-Environment_and_Social_Impact_Assessment
- 14-Environment_and_Social_Impact_Management_Plan
- 15-Incident_Prevention_and_Hazard_Communication_Plan
- 16-Health_Hazard_Prevention_and_Security
- 17-Gaps_in_Knowledge_and_Uncertainties_Encountered
- 18-Conclusions
- Appendix A-Air Quality Impact Assessment
- Appendix B-Noise_Level_Survey_Report
- Appendix C-Geology and Hydrogeology
- Appendix D-Soils_Report
- Appendix E-Ecology
- Appendix F-Socio-economic Assessment
- Appendix G-Archeological_Assessment
- Appendix H-Land_Use_Report
- Appendix I-Traffic Assessment Report
Other reports
- Olkaria_III_Audit_2010-January 2011
- ESIA of Two 250 KW Wind Turbines at Marsabit District
- ESMF KPLC Kenya Electricity Expansion Projoct
- ESIA Voi-Taveta 132 KV TL
- ESIA Eldoret - Kitale 132 KV TL
- ESIA Nanyuki - Meru, Ishiara - Kieni, Mwingi - Kitui - Wote
- ESIA Olkaria - Narok - Bomet - Sotik and Kisii-Sondu 132 KV
- Final Rev ESIA Report Kisii-Awendo 132kV Line October2010
- ESIA Lessos -Kabaranet -Nyahururu -Nanyuki 132 KV TL
- ESIA Mumias-Rangala-Kisumu 132KV TL
- ESIA Kindaruma-Mwingi-Garissa 132 KV TL