Kenya Off-Grid Solar Access Project (KOSAP)
KOSAPS proposed project development objective is to increase access to energy services in underserved counties of Kenya.
Providing equal opportunities to the entire country is key to achieving vision 2030 and especially the national target of achieving universal access to electricity by 2020. This desire has led the Government of Kenya to seek to close the access gap by providing electricity services to remote, low density and traditionally underserved areas of the country. The proposed K-OSAP directly promotes these objectives by supporting use of solar technology to drive electrification of households (including host communities around the refugee camp), enterprises, community facilities and water pumps.
Project Scope of K-OSAP
The project will target 14 out of the 47 counties in Kenya that have been defined as marginalized by the Commission on Revenue Allocation (CRA). The 14 underserved counties collectively represent 72% of the country’s total land area and 20% of the total population. The population is highly dispersed at a density of 4 times lower than the national average. These counties are also characterized by infrastructural deficits, including lack of access to roads, electricity, water and social services most of which are soon going to be a thing of the past thanks to devolution. The 14 counties include; Garissa, Isiolo, Kilifi, Kwale, Lamu, Mandera, Marsabit, Narok, Samburu, Taita
Taveta, Tana River, Turkana, Wajir and West Pokot. The total number of un-electrified households are roughly 1.2 million in these counties.
Project Documents
K-OSAP ESIA REPORTS - (Updated December 6, 2023)
1- ESIA Report for Proposed Abakaile Solar Mini Grid
3-ESIA Report for the Proposed Bombi Solar Mini Grid- 2023_final_17102023
4-ESIA Report for Proposed Bumburi Solar Mini Grid-Final 18.10.23
5-ESIA Report for Proposed Chakama Solar Mini Grid-2023_final_17102023
6-ESIA Report for Elele Solar Mini Grid- 2023
7-ESIA Report for Proposed Funzi Island Solar Mini Grid- 2023 FINAL 17 OCT 2023...doc
10-ESIA Report for Kiwayu Solar Mini Grid-Final -18th Oct-2023
12-ESIA Report for Proposed Olposimoru Solar Mini Grid-2023 FINAL 17TH OCT 2023
13- ESIA Report for Proposed Qumbiso Solar Mini Grid-2023
14- ESIA Report for Proposed Ajawa Solar Mini Grid -2023-Final-19_10_23-1
15-ESIA Report for Proposed Mbalambala Solar Mini Grid-2023
18-ESIA Report for Proposed Busho Solar Mini Grid - Final 18.10.2023
19-ESIA Report for Proposed Dadantallai Solar Mini Grid-2023
22-ESIA Report for Proposed Gababa Solar Mini Grid-2023
24-ESIA Report for Proposed Handaro Solar Mini Grid-Final 17.10.23
26-ESIA Report for Proposed Kilibasi Solar Mini Grid-Final -17th Oct -2023
29-ESIA Report for Proposed Kwa Dzombo Solar Mini Grid-Final-19-10-2023(FIN)
33-ESIA Report for Proposed Malkamari Solar Mini Grid-2023
34-ESIA Report for Proposed Mnazini Solar Mini Grid-2023-Final-18.10.23
36-ESIA Report for Proposed Nanighi Solar Mini Grid-2023 Final 17.10.2023
38-ESIA Report for Proposed Ndau Solar Mini Grid - 2023
39-ESIA Report for Proposed Nyango Solar Mini Grid-2023
40-ESIA Report for Proposed Kwa Nyanje Solar Mini Grid-2023
41-ESIA Report for Ole Sere Solar Mini Grid-2023_Final_18102023
45-ESIA Report for Shirshir Solar Mini Grid-2023(FIN)
51-ESIA Report for Proposed Kajaja Two East Solar Mini Grid-2023-Final-19.10.23
52-ESIA Report for Proposed Kitere Solar Mini Grid- Final 20.10.2023
53-ESIA report for proposed Libehiya Solar Mini Grid-2023
54- ESIA Report for Proposed Lulis Solar Mini Grid-2023
55-ESIA Report for Proposed Daaful (Dagahaley) Solar Mini Grid-19th oct 2023
56-ESIA Report for Proposed Nyatalio Solar Mini Grid-2023
57-ESIA Report for Proposed Guba Solar Mini Grid-2023
58-ESIA Report for Proposed Gagaba Solar Mini Grid-2023
59-ESIA Report for Proposed Olla Solar Mini Grid-2023_Final_20102023
60-ESIA Report for Proposed Garsey Solar Mini Grid-2023
61-ESIA Report for Proposed Qarse Goftu Mini Grid-2023-Final-19.10.23
63-ESIA Report for the Proposed Dujis Solar Mini Grid-Final 19.10.2023
64-ESIA Report for the Daghaley Solar Mini Grid-Final 19th Oct 2023(FIN)
65-ESIA Report for Alikune Solar Mini Grid-2023_Final_20102023(FIN)
67- ESIA Report for Proposed Fincharo Solar Mini Grid-Final 19.10.2023
71-ESIA Report for Proposed Bambo Solar Mini Grid-2023
73-ESIA Report for the Barmish Solar Mini Grid-2023-Final-17.10.23
74-ESIA Report for the Ibrahim Ure Solar Mini Grid-2023-Final-19.10.23
75-ESIA Report for the Burder Solar Mini Grid-2023-(FIN)
76-ESIA Report for the Diff Solar Mini Grid-2023-Final-19.10.23
79- ESIA Report for Proposed Ardha Halo Solar Mini Grid-Final 20.10.2023
82- ESIA Report for Proposed Omar Jillaow Solar Mini Grid-2023-Final-20.10.23
84- ESIA Report for the proposed Dambas Solar Mini Grid-2023-Final-19.10.23
86- ESIA Report for the Proposed Maalimin Solar Mini Grid-Final 19.10.2023
87-ESIA Report for the Proposed Kotile Solar Mini Grid-2023
88-ESIA Report for the Arbajahan Solar Mini Grid-2023
89-ESIA Report for the El-Danaba Solar Mini Grid-2023
90-ESIA Report for the Elram Solar Mini Grid-2023 FINAL 19TH Oct 2023(FIN)
91-ESIA Report for the Goljo Solar Mini Grid-2023-Final-20.10.23
92-ESIA Report for Qara Solar Mini Grid-Final -19th Oct (FIN)
94-ESIA Report for the Madaghisi Solar Mini Grid-2023
95-ESIA Report for the Athibohol Solar Mini Grid-2023
97-ESIA Report for the Kulan Solar Mini Grid-2023 FINAL OCT 2023 (1).docx
98-ESIA Report for the Sabuli Solar Mini Grid-Final- 19th Oct 2023
100- ESIA Report for Proposed Gither Solar Mini Grid-Final 20.10.20232023
101-ESIA Report for Proposed Elgolicha Solar Mini Grid-2023
103-ESIA Report for Proposed Kubi Halo Solar Mini Grid-2023
104-ESIA Report for Proposed Danaba Solar Mini Grid-2023 (2).docx
105-ESIA Report for Proposed Mansa Solar Off Grid-2023-Final-17.10.23
106-ESIA Report for Proposed Meri Solar Mini Grid-2023
108-ESIA Report for Proposed Mkokoni Solar Mini Grid-2023-Final-18.10.23
110-ESIA Report for the Proposed Hamey Solar Mini Grid-2023
111-ESIA Report for the Proposed Damajale Solar Mini Grid_2023-KPLC
112_ESIA Report for Proposed Sake Solar Mini Grid-2023 FINAL OCT 2023(FIN)
113_ESIA Report for the proposed Kumahumato Solar Mini Grid-2023_final_19102023
114_ESIA Report for the proposed Welhar Solar Mini Grid-2023)
117-ESIA Report for the Proposed Garufa Solar Mini Grid-2023
119-ESIA Report for the Proposed Dertu Solar Mini Grid-2023(FIN)
118-ESIA Report for the Proposed Shantabak Solar Mini Grid-2023
120-ESIA Report for the Proposed Lakoley South Solar Mini Grid-2023
122-ESIA Report for Proposed Guticha Solar Mini Grid-2023
123-ESIA Report for Proposed Qudama Solar Mini Grid-2023-Final-18.10.23(FIN
124-ESIA Report for Proposed Ogorale Solar Mini Grid-2023-Final-18.10.23
125-ESIA Report for the Munguvueni Solar Mini Grid-2023-Final-18.10.23
126-ESIA Report for Proposed Dasheeg Solar Mini Grid-2023-Final-19.10.23
127-ESIA Report for the Proposed Yaqo Solar Mini Grid-2023(FIN)
128-ESIA Report for Proposed Boji Garas Solar Mini Grid-2023-Final-19.10.23
129-ESIA Report for Proposed Sarohindi Solar Mini Grid-2023.docx
131-ESIA Report for Proposed JigJiga Solar Mini Grid-Final 19.10.2023(FIN)
1- ESIA Report for Proposed Abakaile Solar Mini Grid
133-ESIA Report for Proposed Qalanqalesa Solar Mini Grid-2023
134-ESIA Report for Proposed Sukela Tinfa Solar Mini Grid-Final 19.10.2023
1- ESIA Report for Proposed Abakaile Solar Mini Grid
ESIA Report for Proposed Kirepwe Solar Mini Grid 2023-KPLC
ESFM ANNEXES - K-OSAP
RPF Reports
SA Report
KOSAPS proposed project development objective is to increase access to energy services in underserved counties of Kenya.
Providing equal opportunities to the entire country is key to achieving vision 2030 and especially the national target of achieving universal access to electricity by 2020. This desire has led the Government of Kenya to seek to close the access gap by providing electricity services to remote, low density and traditionally underserved areas of the country. The proposed K-OSAP directly promotes these objectives by supporting use of solar technology to drive electrification of households (including host communities around the refugee camp), enterprises, community facilities and water pumps.
Project Scope of K-OSAP
The project will target 14 out of the 47 counties in Kenya that have been defined as marginalized by the Commission on Revenue Allocation (CRA). The 14 underserved counties collectively represent 72% of the country’s total land area and 20% of the total population. The population is highly dispersed at a density of 4 times lower than the national average. These counties are also characterized by infrastructural deficits, including lack of access to roads, electricity, water and social services most of which are soon going to be a thing of the past thanks to devolution. The 14 counties include; Garissa, Isiolo, Kilifi, Kwale, Lamu, Mandera, Marsabit, Narok, Samburu, Taita
Taveta, Tana River, Turkana, Wajir and West Pokot. The total number of un-electrified households are roughly 1.2 million in these counties.
Project Documents
K-OSAP ESIA REPORTS - (Updated December 6, 2023)
ESFM ANNEXES - K-OSAP
RPF Reports
SA Report